
Services ›
Decontamination Consulting
Site characterization, remediation planning, and post-remediation verification audits.
Overview
When a site shows elevated NORM levels, our consulting walks the operator from initial scoping through remediation design and final verification. We don't execute the cleanup — we design it, supervise it, and validate it.
After remediation, we provide independent post-remediation audits that confirm exposures are within accepted limits, giving the operator and regulator the documented basis to close the file.
Key activities
- Site characterization and baseline radiological surveys
- Contamination zoning and exclusion-area mapping
- Remediation method selection (mechanical, chemical, encapsulation)
- Waste characterization and disposal-route advisory
- Post-remediation verification audits
- Stakeholder reporting (operator, regulator, insurer)
Methodology
All decontamination consulting follows IAEA Safety Standards guidance. Calibrated instruments are used end-to-end, and the QA Manual ensures consistency between baseline, in-progress, and verification surveys so changes are real, not artifacts.
The auditing posture is independent — we will sign off only when the data supports it, regardless of project pressure.
